24/7 emergency HVAC/Average arrival 60 min/(214) 555-0184

Since 2008

A service company that shows its work.

ArcticPeak started with two trucks and a rule that still runs the board: the price comes before the repair. Fourteen people, one Dallas shop, and a 24-hour line that does not dump you into voicemail.

Measure, then talk

Temperatures, pressures, and a load calc beat a story about what usually fails.

The number comes first

You approve a price. Then we turn a wrench. After-hours included.

No scare script

We will not invent a cracked heat exchanger to sell a furnace. If it is cracked, we will show you.

Leave the house better

Shoe covers, drop cloths, and the old equipment gone the same day on replacements.

The people on the truck and the phone

Same roster as the dispatch board. License TACLA384921C. NATE on the lead techs. EPA 608 on everyone who opens a system.

Leadership

EV

EMP-001

Elena Voss

Owner

Spent twelve years as a manufacturer field rep before starting ArcticPeak in 2008. Still rides along on the installs she is unsure about.

MH

EMP-002

Marcus Hale

Office manager

Builds the daily board. If a job is going to run long, he calls you before the tech is late, not after.

Dispatch

KB

EMP-003

Keisha Brooks

Dispatcher

Live answer, day and night. She writes the after-hours texts and pages the on-call tech when the house is actually unsafe.

JE

EMP-004

Jordan Ellis

Dispatcher

Owns missed-call text-back and the weekend board. If you rang and hung up, Jordan is already typing.

Sales

AT

EMP-005

Alicia Tran

Sales estimator

Runs the load calculations and the financing conversations. She will talk you out of a system you do not need.

TW

EMP-006

Tessa Ward

Sales estimator

North DFW replacements and dual-fuel math. She brings the rebate paperwork to the kitchen table, not a week later.

Technicians

JR

EMP-007

Jonah Reeves

Lead technician, NATE

Combustion and refrigeration. The person we send when two other companies have already replaced the wrong part.

DB

EMP-008

Devon Blake

Technician

Fort Worth, Arlington, and the after-hours no-cool list. Stocked for capacitors, contactors, and igniters.

CO

EMP-009

Camila Ortiz

Technician

Plano to McKinney. Indoor air, ducts, and thermostats. Bilingual on the job.

LP

EMP-010

Lauren Peck

Technician

Mini-splits and heat pumps from Irving through Carrollton. Teaches auxiliary heat so winter bills stay honest.

SP

EMP-011

Samir Patel

Technician

Furnaces, venting, and carbon monoxide. Denton and the northern edge of the board.

RC

EMP-012

Riley Chen

Technician

Rooftop units, restaurants, and suite complaints. Writes the report the property manager can forward.

Install

AW

EMP-013

Andre Whitfield

Installer

Changeouts, permits, and the old equipment gone the same day. Drop cloths are not optional on his truck.

NK

EMP-014

Nate Kim

Installer

Heat pumps, dual fuel, and the duct connections that decide whether the SEER2 sticker is real.

Timeline

  1. 2008

    Opened on Ross Avenue

    Two trucks, a dispatcher, and a rule: price the job before the repair.

  2. 2014

    NATE standard

    Every lead tech certified. Apprentices ride with them for a full season before they run calls alone.

  3. 2019

    Maintenance plans

    Stopped selling tune-ups as a coupon. Started scheduling them like a real appointment.

  4. 2024

    Heat pump practice

    Dual-fuel and all-electric designs became a standing offer, with the fuel math written down.

  5. 2026

    After-hours Aria

    Chat, missed-call text-back, and an after-hours receptionist so a 1 AM no-cool does not go to voicemail.

NATE certified

Lead technicians hold North American Technician Excellence certification.

EPA Section 608

Required to handle refrigerant. Every tech who opens a system carries it.

Licensed & insured

Texas ACR license TACLA384921C. General liability and workers comp on every job.

ENERGY STAR partner

We install labeled equipment and leave you the paperwork rebates ask for.

In the community

Career-day benches

Twice a year we host high-school students for a morning on airflow, safety, and what the job actually pays.

Cooling for clinics

We donate one diagnostic day each summer to a community clinic that cannot lose its pharmacy cooler.

Filter drives

October pickup in the shop lobby. New filters in, used ones recycled, no coupon attached.